Catching Up
No, work hasn’t stopped completely on the house. My blogging about it has due to delays and the fact that I have managed to misplace my camera (!).
The kitchen is finished, with new appliances, countertops and cabinet harware in place. It looks great, I wish you could see it. I’ve got to find that camera. It will probably show up at some point in the move.
The master bathroom is coming along slowly but surely. I have had to enlist a bit of help with the heavy stuff so as not to hurt my back more, but Robert Lee has helped me move most of the heavy stuff around. Right now I’m leveling the floor and preparing to put down Hardibacker so that I can tile it.
The tub is in, the felt paper and Durock are up in the tub surround, and I’ve installed the valve assembly for the new tub faucet. I need to paint on the waterproofing layer and then it will be ready for tiling.
The sheetrock is done on the walls, but they have yet to be primed.
I haven’t done any electrical work, which leaves me with one sconce and two overhead vanity lights to install. Since it is a double sinked vanity with two seperate mirrors, we decided to go wth two vanity lights to keep the symmetry going. The wall sconce is near the toilet and I’m toying with the idea of putting a very low wattage bulb in it and a photoeye to turn it on in the dark, thus making it a kind of night light. For right now, though, it is staying on a switch.
So that is where we are at. I am about to go check the mortar bed for level now and if it is, the backer board goes down, if not I will level it out and wait for it to dry.